ITEM
NO |
DESCRIPTION |
CHARGE |
APPLICABLE
SECTION |
| 1 |
Deposit for the supply of water. |
Two month's estimated consumption multiplied by the relevant cost of water in terms of item 6 |
II/6 |
| 2 |
Connection charge based on nominal size of connection (1) 20mm |
R1467,54+R205,46VAT=R1673,00 |
11/7 and II/8(5) |
| |
(2) 25mm |
R2420,53+R338,87VAT=R2759,40 |
|
| |
(3) 40mm |
R2824,12+R395,38VAT=R3219,50 |
|
| |
(4) 50mm |
R4325,70+R605,60VAT=R4931,30 |
|
| |
(5) 75mm |
Full Cost |
|
| |
(6) 100mm |
Full Cost |
|
| |
(7) 150mm |
Full Cost |
|
| |
(8) More than 150mm |
Full Cost |
|
| |
(9) Connection in excess of 30 m - for every 5m or part thereof provided that in any Municipal Housing scheme, the connection fee may, at the discretion of the Engineer, be charged at full cost. (M.N. 57/97) |
15% surcharge. |
|
| 3 |
Cutting-off or restriction of the water supply |
Nil |
II/II(3)(a), (11.12(2) and 11/25(3)(b) |
| 4 |
Restoration or reinstatement of water supply: (1) Subject to items 4(4) and 4(5), after cutting-off or restriction due to non-payment of monies due or breach of Bylaws. |
R303,51 + R42,49 VAT : R346,00 |
II/II(3)(b) |
| |
(2) After disconnection at consumer's request |
R275,70+R38,60VAT: R314,30 |
II/12(2) |
| |
(3) Cutting-off or restriction due to contravention of water restriction notice |
R303,51+R42,49VAT: R346,00 |
II/25(3)(b) |
| |
(4) After cutting-off due to non-payment of monies due, such outstanding monies having been paid on the same day as the disconnection was effected, provided that the supply has not similarly been disconnected within the last three (3) months. |
Nil |
II/11(3)(b) |
| |
(5) After cutting-off due to non-payment of moneis due, the water supply being reinstated on the day following that on which payment is made. (P.N. 180/97) |
R57,81 + R8,09 VAT: R65,90 |
II/11(3)(b) |
| 5 |
Change in size of meter at Engineer's discretion |
Nil |
II/14(6) |
| 6 |
(1) Potable water (a) For domestic consumption where all water is consumed through a break pressure tank, per dwelling unit calculated on a daily basis : |
|
11/16(1) |
| |
(i) Monthly consumption up to 6kl |
R1,05/kl plus R0,147VAT: R1,197/kl |
|
| |
(ii) Monthly consumption greater than 6kl up to 30kl |
R1,94 plus R0,27VAT: R2,21 |
|
| |
(iii) Monthly consumption greater than 30kl |
R5,78 plus R0,81VAT: R6,59 |
|
| |
(iv) Monthly fixed charge calculated on a daily basis |
Nil |
|
| |
(b) For domestic consumption where all water or part of the water is supplied without the intervention of a break pressure tank (that is at full supply pressure), per dwelling on a daily basis : |
|
|
| |
(i) Monthly consumption up to 6kl |
R1,77/kl plus R0,248VAT: R2,018/kl |
|
| |
(ii) Monthly consumption greater than 6kl up to 30kl |
R2,89 plus R0,40VAT: R3,29 |
|
| |
(iii) Monthly consumption greater than 30kl |
R5,78/kl plus R0,81VAT: R6,59/kl |
|
| |
(iv) Monthly fixed charge calculated on a daily basis |
R20,50 plus R2,87VAT: R23,37 |
|
| |
(c) For all other classes of consumer other than domestic consumers: (i) Consumption |
R2,89 plus R0,40VAT: R3,29 |
|
| |
(ii) Monthly fixed charge calculated on a daily basis on a nominal connection size up to 20mm |
R20,50 plus R2,87VAT: R23,37 |
|
| |
(iii) Monthly fixed charge calculated on a daily basis on a nominal connection size greater than 20mm but not exceeding 25mm |
R32,00 plus R4,48VAT: R36,48 |
|
| |
(iv) Monthly fixed charge calculated on a daily basis on a nominal connection size greater then 25mm but not exceeding 40mm |
R82,00 plus R11,48VAT: R93,48 |
|
| |
(v) Monthly fixed charge calculated on a daily basis on a nominal connection size greater than 40mm but not exceeding 50mm |
R128,00 plus R17,92VAT: R145,92 |
|
| |
(vi) Monthly fixed charge calculated on a daily basis on a nominal connection size greater than 50mm but not exceeding 75mm |
R288,00 plus R40,32VAT: R328,32 |
|
| |
(vii) Monthly fixed charge calculated on a daily basis on a nominal connection size greater than 75mm but not exceeding 100mm |
R513,00 plus R71,82VAT: R584,82 |
|
| |
(viii) Monthly fixed charge calculated on a daily basis on a nominal connection size greater than 100mm but not exceeding 150mm |
R1150,00 plus R161,00VAT: R1311,00 |
|
| |
(ix) Monthly fixed charge calculated on a daily basis on a nominal connection size greater than 150mm |
R2050,00 plus R287,00VAT: R2337,00 |
|
| |
(2) Non-Potable Water |
R0,638/kl + R0,089 VAT : R0,727/kl |
|
| 7. |
Water availability charge: (1) Each communication pipe |
Nil |
II/19(a) |
| |
(2) Each meter |
Nil |
II/19(b) |
| 8. |
Deposit for hydrant meter |
Nil |
II/20(4)(b) |
| 9. |
Supervision of hydrant meter - per hour or part thereof |
R226,32 + R31,68 VAT : R258,00 |
II/20(5) |
| 10. |
Use of hydrant meter - per hour |
Nil |
II/20(7) |
| 11. |
Testing of water meters: |
|
|
| |
(1) Class 2 and 4 |
R152,63 + R21,37 VAT : R174,00 |
|
| |
(2) Class 12 and 16 and 35 |
R233,95 + R32,75 VAT : R266,70 |
|
| |
(3) Class 55 and 100 |
R412,28 + R57,72 VAT : R470,00 |
|
| |
(4) Class 200 |
R522,81 + R73,19 VAT : R596,00 |
|
| |
(5) Greater than Class 200 |
Full cost |
|
| 12. |
Approval of installation work: |
|
III/1(2)(a) |
| |
(1) Single dwelling unit |
Nil |
|
| |
(2) Multiple dwelling units and other installations |
R188,60 + R26,40 VAT : R215,00 |
|
| |
(3) Alterations to existing installations |
Nil |
|
| |
(4) Additions to existing installations |
Nil |
|
| 13. |
Extension of validity of approval of installation works - per year |
R18,95 + R2,65 VAT : R21,60 |
III/2 |
| 14. |
Permission for private persons to carry out installation work |
R93,86 + R13,14 VAT : R107,00 |
IV/1(5)(a) |
| 15. |
Registration of contractor |
R97,37 + R13,63 VAT : R111,00 |
IV/2(1) |
| 16. |
Renewal of contractor's registration |
R36,05 + R5,05 VAT : R41,10 |
IV/2(3) |
| 17. |
Registration of responsible plumber |
R52,02 + R7,28 VAT : R59,30 |
IV/3(1) |
| 18. |
Renewal of responsible plumber's registration |
R18,95 + R2,65 VAT : R21,60 |
IV/3(3) |
| 19. |
Replacement of certificates of registration |
R36,05 + R5,05 VAT : R41,10 |
IV/5(2) |
| 20. |
Re-inspection after disinfection and testing |
R117,54 + R16,46 VAT : R134,00 |
V/1(4) |
| 21. |
Application for approval of fittings |
Nil |
VI/4(1) |
| 22. |
Renewal of approval of fittings |
Nil |
VI/4(2) |
| 23. |
Schedule of accepted pipes and water fittings |
R18,95 + R2,65 VAT : R21,60 |
VI/4(5) |
| 24. |
Pressure Tests: (1) 24 hour pressure recording |
R185,09 + R25,91 VAT : R211,00 |
VI/6(1)(b) |
| |
(2) 7 day pressure recording |
R185,09 + R25,91 VAT : R211,00 |
|
| |
(3) Pressure and flow test |
R150,00 + R21,00 VAT : R171,00 |
|
| 25. |
Replacement of broken hydrant seal |
Nil |
IX/1(3)(b)(ii) |
| 26. |
Testing of water from other sources |
R517,28 + R72,42 VAT : R589,70 |
X/3(2) |
| 27. |
Change of meter outside normal working hours at consumer's request |
R881,58 + R123,42 VAT : R1005,00 |
|
| 28. |
Locating a consumer's pipe and tracing leaks: (1) During normal working hours |
R369,30 + R51,70 VAT : R421,00 |
|
| |
(2) Outside normal working hours at consumer's request |
R573,68 + R80,32 VAT : R654,00 |
|
| 29. |
Changing over existing 15/20/25 mm connection to consumer's renewed piping |
R328,95 + R46,05 VAT : R375,00 |
|
| 30. |
Resiting of fire hydrant: (1) Distance not exceeding 2m |
R2 006,14 + R280,86 VAT : R2 287,00 |
|
| |
(2) Distance exceeding 2 m (including the relocation of the hydrant tee) |
R4 426,32 + R619,68 VAT : R5 046,00 |
|
| 31. |
Resiting of water meter (1) Distance not exceeding 2m for connection size:
15, 20 and 25 mm |
R463,16 + R64,84 VAT : R528,00 |
|
| |
40 and 50 mm |
R632,46 + R88,54 VAT : R721,00 |
|
| |
75 and 100 mm |
R1388,60 + R194,40 VAT : R1583,00 |
|
| |
150 mm |
R2 201,75 + R308,25 VAT : R2 510,00 |
|
| |
Greater than 150 mm |
Full cost |
|
| |
(2) Distance exceeding 2 m. |
The tariff for a new connection will apply. |
|
| 32. |
Repairing of water connection equal to or less than 25 mm nominal diameter |
R407,02 + R56,98 VAT : R464,00 |
|
| 33. |
Penalty for consumer's piping not being in order for connection to Council water main on date requested |
R44,56 + R6,24 VAT : R50,80 |
|
| 34. |
Replacement of stolen or damaged water meter: Class 2 |
R326,32 + R45,68 VAT : R372,00 |
|
| |
Class 4 |
R391,23 + R54,77 VAT : R446,00 |
|
| |
Class 12 |
R688,60 + R96,40 VAT : R785,00 |
|
| |
Greater than Class 12 (M.N 57/97) |
Full cost |
|
| 35. |
For any other service where tariff is not specified |
Full cost |
|
| 36. |
200 litre domestic water tank filled daily Monthly charge |
R8,16 + R1,14 VAT : R9,30 |
|
| 37. |
Deposit for the supply of water - domestic semi-pressure |
R75,00 |
|
| 38. |
Connection charge - domestic tank |
R217,81 + R30,49 VAT : R248,30 |
|
| 39. |
Semi-pressure connection |
R422,81 + R59,19 VAT : R482,00 |
|
| 40. |
Restricted (stand pipe) connection |
R744,74 + R104,26 VAT : R849,00 |
|
| 41. |
Relocation charge - domestic tank |
R55,00 + R7,70 VAT : R62,70 |
|
| 2.0 |
All references to applicable sections in this Schedule refer to the corresponding sections in the Durban Metropolitan Water Supply Bylaws. |
|
|
| 3.0 |
Unless inconsistent with the context, the words and phrases in this Schedule shall have the meaning ascribed to them in the Durban Metropolitan Water Supply Bylaws. (M.N. 103/96; 57/97) |
|
|
| |
|
|
|